Architectural Guidelines
Policy #2010-2 Rights-of-Way Policy
Policy #2010-4 Road Use/Construction Fee Policy
  Clarification to Construction Policy
Policy #2007-1 Driveway Culvert Policy
 
BEFORE YOU BUILD!

Prior to beginning any construction within QCP, the following steps are required of all property owners:
  1. A Construction/Road Use Fee must be paid to QCPOA before applying for a building permit for a Single Family Residence (SFR) and/or a septic permit (Policy #2010-4).

  2. A minimum 12 inch diameter culvert must be installed as part of all driveways constructed after July 3, 2007 as outlined in QCP Policy #2007-1

  3. The Rights-of-Way Policy for QCP (Policy #2010-2) must be observed.

Gunnison County will require that the Association issue a letter prior to the building permit application and/or septic permit (ISDS) process stating that all Association requirements have been met.

Gunnison County does not allow unpermitted living structures, including the use of “Ten by Twelve’s” as residential units. Please be advised that the county may enforce penalties for such use and QCPOA advises all owners to avoid this practice.

CONTACT THE ARCHITECTURAL/PRE-CONSTRUCTION COMMITTEE CHAIR TO OBTAIN YOUR LETTER.

SEE “ASSOCIATION POLICIES” FOR MORE DETAILED INFORMATION ON THE POLICIES LISTED ABOVE.